Location



Area               : 2,102.82 sq. km.
Region           : Region VIII
Provinces      : Eastern Samar, Samar and Northern Samar
Towns/Cities : 1 City and 9 Municipalities
Barangays      : 360
Outlet             : Philippine Sea
Est. Pop’n       : 354,091
RBO                 :
RDC Reso.       : RDC VIII Resolution No. 57, Series of 2019
Forestland       : 683.81 sq. km.
A&D                  : 1,419 sq. km.
Proposed Investment (Total)         : PHP 36,989,044,912

The Cluster 6 River Basin covers three Principal River Basins from the Samar Island located in Eastern Visayas Region or Region VIII. It encompasses 210,282 ha. The Principal River Basins (PRB) bounded are Catubig, Catarman, and Pambujan PRBs. The three Principal River Basins (PRBs) of Cluster 6 covers three provinces in Samar Island, such as the Eastern Samar, Samar, and Northern Samar. Northern Samar has the largest areal coverage in the Cluster (77.8%). Of all the municipalities in the cluster, the municipality of Catarman in Northern Samar has the largest area covered, while Santa Margarita in Samar Province has the smallest area coverage (0.04%).
There are two minor watersheds in between the three PRBs, which encompass about 39,675 ha of the Northern Samar Province. Of the six (6) municipalities it bounds, the municipality of Mondragon, Northern Samar has the largest area (58.2%). On the other hand, the minor watersheds encompass only 0.9% of the land area of Catarman, Northern Samar.

VISION

Catarman Principal River Basin

“A Catarman PRB that is resilient, pollution-free and is providing sustainable goods and services for its stakeholders, who in return manages the watershed efficiently.”

Catubig Principal River Basin

“A Catubig PRB that is resilient, sustainable, and well-managed by its empowered, responsible, and supportive stakeholders.”

Pambujan Principal River Basin

“A resilient and sustainable Pambujan PRB that is well-managed by its empowered stakeholders”

MISSION

Catarman Principal River Basin

“Improve the resiliency and sustainability of PRB through establishment of sustainable watershed management for a well-balanced environment.”

Catubig Principal River Basin

“Lessen the impact of disaster risks and climate change through sustainable watershed management and capacity building.”

Pambujan Principal River Basin

“A safe and risk-free environment with capacitated communities achieved through sustainable watershed management.”

PROTECTED AREAS
  1. Samar Island National Park
ECOSYTEM SERVICES

  • Irrigation – 21,048 hectares
  • Dam – Libjo Diversion Dam
  • Macagtas Water Impounding Project
  • San Jose Diversion Dam

  • Rice – 323, 531 metric ton
  • Corn – 22, 183 metric ton
  • Livestock – Declining Production
  • Poultry – Stable Production
  • Fisheries – Increasing Production
  • Forestry – Log 72 cubic meter

  • Coal – 1050 MW
  • Oil – Based – 473 MW
  • Diesel – 473 MW
  • Renewable Energy – 1454 MW
  • Geothermal – 1454 MW
  • Hydro – 18 MW
  • Wind – 90 MW
  • Biomass – 84 MW

  • Flora – Catubig – 1921 Species
  • Catarman – 1006 Species
  • Pambuhan – 530 Species
  • Fauna – 285 species

THEMATIC AREAS

  1. Water Resources Management
    • Low Investment
    • Inadequate Water Research
    • Decline in Agricultural Productivity
    • Insufficient Water for Domestic Use

    • Rainwater Harvesting
    • New Irrigation System
    • Deep Well Project
    • Improvement and Rehabilitation of
    • Existing Systems and Water Supply
    • Facilities Program
    • Effective Ecological Waste Management Program
    • Water Quality Monitoring and Assessment Project

    • PHP 9,562,957,965

  2. Forest Ecosystem and Biodiversity Management
    • Illegal Poaching (Flora and Fauna)
    • Illegal Quarrying
    • Illegal Land Conversion
    • Low Soil Fertility

    • Adaptive Forest Ecosystem Restoration (A-FORESTORE) Program
    • River Basin Protection and Conservation Project

    • PHP 6,241,434,587

  3. Wetland Management
    • Wetland Pollution
    • Land Conversion
    • Illegal Fishing
    • Pest Infestation
    • Decline of Marine Resources
    • Decline of Agricultural Production

    • Wetland Protection Program
    • Wetland Restoration Project
    • Integrated Coastal Zone Management Project

    • PHP 8,560,665,411

  4. Disaster Risk Reduction and Management
    • Vulnerable Old Infrastructure
    • Insufficient Relief Operations
    • Use of Unsuitable Buildings for Evacuation

    • Relocation Project
    • Slope Stabilization Project
    • Flood Control Project
    • Adaptive Capacity Improvement Program

    • PHP 12,268,784,069

  5. Economic Development
    • Migration
    • Higher Crime Rate
    • Watershed resource degradation
    • Unemployment
    • Calamities

    • Value Chain Program

    • PHP 134,880,000